Master Plan Phases

Phase 1: Portico and Accessibility

  • Portico restoration with a focus on cornices, pilaster corners, stairs, entrances and the ramp
  • Reconstruction of north and south stairs with new brownstone
  • North ramp and basement stair enclosure
  • Restoration of wood windows, door and cornices with replacement hardware for portico entrances
  • Gutter, flashing and downspout replacement
  • Bird control
  • Wrought iron railing restoration at east stairs
  • Iron sconce restoration at east entrance
  • Initial exploration and make safe efforts of steeple including investigation, hands-on sounding, and mock-ups

Phase 2: Sanctuary stone, roof and gutters

  • Slate and membrane roof replacement
  • Restoration of cornice and body brownstone on north and south sides of sanctuary
  • Lightning protection

Phase 3: Steeple

  • Steeple restoration
  • Portico roof and flashing
  • Belfry louver replacement
  • Clock face and mechanics
  • Weathervane
  • Interior steel repairs
  • 100% repointing of steeple interior and exterior
  • Lightning protection

Phase 4: Parish House, West Elevation

  • Parish House brownstone, brick façades, and chimney
  • Sanctuary west facade
  • Parish House membrane roof replacement
  • Lightning protection

Potential Preservation and Safety Project Additions (contingent on budget)

  • North ramp full stone upgrade
  • Recreation of lost roofline balustrade and urns
  • Structural engineering study and roof structure repair
  • Hunnewell Chapel stained glass windows restoration
  • Fire suppression system and alarms
  • Security system
  • Rooftop glass enclosure for emergency egress
  • Elevator
  • Air conditioning
  • Event space bathroom remodel
  • Interior finishes and lighting
  • Signage, information, and wayfinding

Project Team

Architect
Engineer
Preservation Planner
Project Manager
Brownstone Specialist